Tunnel Construction Methods and Safety Tips
Tunnel Construction Methods Introduction
To create an underground passage that passes through the hill, under buildings or roads, underwater or under entire cities Tunnels are required. It is a civil engineering structure that plays a vital role to go across obstacles, provide connections under the sea, and provide sewage systems and many more. Without tunneling, these works or essentials cannot be done. Tunnels can be used in a wide range that depends upon the scale of the tunnel, groundwater condition and the availability of space. The following are the major information about tunnel construction methods. Please go ahead and keep up the good work.
The major concern things are required during tunnel construction:-
Purpose of using Tunneling: Before using the tunnel first know the purpose of using tunnels and cross-section of the tunnel.
Ground form and shape: This influence to lookout the route for the tunnel and whether it is economical or feasible to construct where there may be poor conditions of defects in strata.
Construction Planning: The planning will help to see depending on the type of tunnel. The ground conditions, the tunnel length required and the timings of the project.
Remove of debris: The size and length of the tunnel will determine the equipment is necessary for mucking out debris.
Control of water: This is a major factor that required. Pumping is the most common technique for dealing with the presence of water whilst.
Methods of Tunnel Construction – Tunneling Methods
Drill and Blast: This is generally required for the hard rock where digging is not possible and was very common before the development of tunnel boring machines (TBM).
Road headers: These machines are used for the track-mounted excavating that have powerful cutting booms and are commonly used in coral mining or civil engineering works.
Open-cut method: Open-cut generally involves the construction of an open trench in which the tunnel is constructed. It depends upon the ground conditions, the sidewalls may be constructed before the trench is created.
Cut and Cover: It basically required for creating the roof slab of the tunnel first, within a shallow trench.
Immersed – tube method: This method is appropriate for tunnels that cross deep water or prepared trench at sea or river.
Safety – Tunnel Construction Safety Tips
Tunneling always required while working at height, in confined spaces, sprayed material and the operation of heavy plant. So, for that reason, there is careful risk
assessment and risk management and a high level of training and supervision are required.
There were several safety schemes for personnel and the British Tunneling Society has produced a Code and Practice for the management of risk in tunnel work or the embracing of which required by insures.