Procedure for Foundation Marking – Setting out Foundations

Foundation marking procedure is very much an important part of any building construction project. Learn in this video how to mark foundation or setting out foundations correctly.

This construction video serves a detailed step by step guidelines on foundation marking for a construction job. In this video, you will see the plan of foundation marking for the living room as well as the kitchen.

The centerline marking is also provided with 6 numbers of columns. Initially, you have to set the base point as it is very crucial for marking. After that, a baseline is arranged from that base point with a thread for fixing the second point.

Watch this video carefully. The procedure for foundation marking is easy but you should be accurate on your calculation. It is also called building marking procedure. The centerline of the wall perpendicular to the long wall is marked by making a proper angle.

The right angle is arranged by creating triangles with sides 3,4 and 5units long. If we set the two sides of the right angles triangle to be 3 m, and 4 m, then the third side i.e. the hypotenuse is assumed at 5 m. A steel tape should be used to fix all the dimensions.